Project at a glance...
- Location
- Balham, SW12
- Services
- Floor Sanding, Gap Filling
- Size
- 17 sqm restored
- Flooring
- Oak engineered wood flooring
- Finish
- Tover Home Maxi · Matt lacquer 1 coat primer + 2 coats
Before & after
Before the works...
The oak engineered wood flooring in this Balham property was looking tired and in urgent need of restoration. During our free site survey, we did detailed inspection of the floors & discussed with the client all possible choices, followed by detailed quote with our floor sanding & repairs pricing for engineered wood flooring.
Our client has decided to go for floor sanding and gap filling of 17 sqm oak engineered wood flooring and finishing the floors in matt Lacquer.
How we completed this oak engineered wood flooring renovation...
Engineered wood flooring comes with different depth of the top layer. During the initial site visit, we have confirmed the remaining thickness however, our team will verify again, there is sufficient depth before starting the floor renovation works.
During the oak engineered floor restoration, the entire timber surface is going through a process of levelling with coarser grids, finishing with finer grids, and finally buffing, prior to sealing & between the coats, for outstanding results.
Our works included approx. 17 sqm oak engineered wood flooring floor renovation and finishing in matt lacquer. The sealing went down with 1 coat of primer and 2 coats of Tover Home Maxi lacquer.
We also carried out gap filling as part of the floor restoration process. We aim to apply the resin filler with saw dust in late hours of the working day, so it settles properly overnight and in case it is needed we can repeat it on the following morning, if required. The filler is after that removed by next stages of the floor sanding process in medium grids.
Overall, this floor sanding project in Balham was completed as originally planned and to the satisfaction of the client.